BOKU Vienna

About This Project

Customer:

Bundesimmobiliengesellschaft (BIG)

Data:

  • Construction costs: approx. EUR 10.000.000,-
  • Project period: 01/2018 – 09/2020
  • Start of construction: 03/2019

Services of DELTA

  • General planning
  • Integral overall coordination
  • Tender Preparation, Procurement & Processing
  • BauKG (planning and construction site coordination)
  • In ARGE with SWAP Architects as General Planners: Architecture, Statics, Building Services, Building Physics, Fire Protection

Excerpt from the jury report

“…The upper floors designed as typical storeys convince the jury not only in their clean, constructive logic, but also in their spatial, task-appropriate qualities. The intelligent differentiation of the ceiling constructions (wooden ribbed slab in the ground floor and upper floor and laminated wood ceilings in the overlying standard floors) creates an atmosphere suitable for the use, which has a meaningful effect on the users. At the same time, the economical construction offers a high degree of flexibility. In addition, the appearance and the positive impression of the new BOKU building are praised by the jury as a contemporary “timber construction” statement, which sets the necessary accent in the heterogeneous urban environment, without blocking future development scenarios.”