ENGEL, Kaplice

About This Project

Project Details

Customer:
ENGEL strojírenská spol. s.r.o., Kaplice

Data:

  • Planning period: December 2015 – June 2018
  • Construction period: July 2016 – June 2018
  • Area of ​​office building 3,200m2 (4x800m2)
  • Area of ​​the new production hall: 22,000 m2 (3-sided cultivation during operation)
  • Area of the car park, parking spaces, roads, green area: 40,982 m2
  • Additional building:
    • separate building for the technical center
    • Transformer station + large power switching station
    • Valve and sprinkler station
    • Number of parking spaces: 575
    • Investment construction costs: about 900 million CZK

 

Services of DELTA:

  • General Planner
  • Project management
  • cost control
  • Tendering management
  • Construction Management
  • Local site supervision
  • Building certification
  • Data pool
  • Culture management in the construction project

 

Specifics:

  • Construction during ongoing operation of the production hall
  • Largest and highly technical dry paint shop in Europe
  • One component of the realization of the project is the transformer station and switchboard, from which the production hall as well as the office building are provided
  • Data pool for the management of construction projects and distribution of data
  • Construction Management without general contractor
  • Award: Certificate SAFE CONSTRUCTION EU 2016

photo: Tomas Haverliky