FACC Plant 4

About This Project

Project Details

A precise colour coding system facilitates orientation in the building, which can be extended if required. The current centre of the factory will remain the focus of the plant, so that central areas such as the canteen and office only need to be constructed once.

Client
FACC AG

Data
Implementation period: 2006-2007
Construction period: 13 months
Constructed area: 20,000 m²
Total floor space: 26,500 m²

DELTA Services

  • Architecture
  • Site supervision
  • Structural engineering design
  • Design coordination
  • Construction coordination

Photos: FACC AG